SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2008111048,"Los Angeles, City of",City of Los Angeles,,Forest Lawn Memorial Park - Hollywood Hills Master Plan,NOP,11/12/2008,,"The Project Applicant, Forest Lawn Memorial-Park Association, proposes a long-term Master Plan for its Hollywood Hills property to continue its current range of cemetery-related uses. The Project seeks approval to construct approximately 22,500 square feet of floor area for new structures (including such structures as a new church and reception-related uses, administration space, and a crematory), approximately 1,000,000 square feet of non-occupied floor area (for such uses as burial garden structures, wall crypts and columbaria), and approximately 200,000 new internet sites. It is estimated that over a five-year construction period (by year 2015), approximately 3.3 million cubic yards of earth would be graded. Net export during grading wil be approximately 720,000 cubic yards. In addition, up to 400,000 cubic yards f dirt will be exported in connection with grave preparation from 2010 to 2050 . It is estimated that construction of the new structures would occur over an approximately 40-year period from 2010 to 2050. The sale of interment sites is expected to occur through year 2050 and beyond. In order to provide for these future needs, Forest Lawn seeks a Public Benefits approval, Development Agreement, Site Plan Review findings, grading and stockpiling permits, haul route approval and related land use and building permits as required for the Project and any additional actions that may be determined necessary. (Forest Lawn will also request a Protected Trees Removal permit through Department of Public Works.) In additional, regulatory permits from the Department of Fish and Game, Regional Water Quality Resources Board and Army Corps of Engineers will be required.",https://ceqanet.opr.ca.gov/2008111048,Forest Lawn Memorial Park - Hollywood Hills Master Plan,Diana Kitching,City of Los Angeles,N/A,,"200 N. Spring Street, Room 750",,Los Angeles,CA,90012,2139781351,,Los Angeles,Los Angeles,,Forest lawn,90041,444+/-,5581007***,134 and 2,Los Angeles River,,No,11/12/2008,12/11/2008,Other,"Master Plan, Use Permit","Aesthetics, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hydrology/Water Quality, Land Use/Planning, Noise, Transportation",,,,,,,,,,,,,,,,,