SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2008108455,Fish & Game #3,,,Occidental Road Short Term Emergency Mitigation Plan,NOE,11/3/2008,11/3/2008,"The Applicant proposes to implement an immediate remediation plan as required by North Coast Regional Water Quality Control Board Cleanup and Abatement Order No: R1-2008-0096. This Cleanup and Abatement Order (CAO) is in response to illegal dredging activity in the unnamed tributary sometime between June 16 to June 20, 2008. This activity resulted in substantial disturbance (i.e. dredging, and removal of riparian vegetation on the right bank) to approximately 600 linear feet of the unnamed tributary. The activity carved a new, approximately 400-foot, channel through seasonal wetlands, which currently diverts the natural flow of the unnamed tributary from its undisturbed channel. To remediate the disturbance caused by the activity the applicant proposes a project to install a series of check dams at 25-foot intervals along the dredged draining course of the un-name tributary, such that the flow-line elevation of the check dams will be at grade with the undisturbed portions of the unnamed tributary. As part of this short-term remediation plan the applicant will install erosion control fabric along the disturbed reach of the unnamed tributary. To further aid in reducing the potential for erosion the Applicant will also install fiber rolls along the upper bank of the disturbed reach of the unnamed tributary back to its natural channel using sandbags or the native fill material in conjunction biotechnical bank stabilization methods. Issuance of a Streambed Alteration Agreement Number 1600-2008-0498-3 is pursuant to Fish and Game Code Section 1602. ",https://ceqanet.opr.ca.gov/2008108455,Occidental Road Short Term Emergency Mitigation Plan,Dan wilson,California Department of Fish and Game,N/A,,P.O. Box 47,,Yountville,CA,94559,7079445534,,Sebastopol,Sonoma,,,,,,,,,,,,,,,,,Categorical Exemption,"Class 4, Section 15304",The project will result in the filling of earth into previously excavated land with material compatible with the natural features of the site.,,,,,,,,,,,,