SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2008108365,"Ione, City of",City of Ione,,"Borgh Boundary Line Adjustment, 08-006",NOE,10/24/2008,10/24/2008,"The applicant, David Borgh, is requesting a Boundary Line Adjustment (BLA) to add 0.02 acres to the south side of the subject property, APN 005-130-010, at 9155 State Highway 124. The proposed action would square up the property line with an existing structure and provide space for the movement of vehicles behind the structure.",https://ceqanet.opr.ca.gov/2008108365,"Borgh Boundary Line Adjustment, 08-006",Christopher Jordan,City of Ione,N/A,,P.O. Box 398,,Ione,CA,95640,(209) 274-2412 x 104,,Ione,Amador,,,,,,,,,,,,,,,,,Categorical Exemption,"Sec.15305,Class5","The proposed project would increase the size of the lot by 0.02 acres and provide greater mobility around an existing structure. The project would not increase the density or intensity of development and would be characterized as a minor adjustment in the lot lines. Therefore, this project qualifies for the Class 5 exemption and no further environmental review is necessary.",,,,,,,,,,,,