SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2008108125,"Regional Water Quality Control Board, Region 1 (North Coast), Santa Rosa",,,"Humboldt Co. DPW - Jacoby Creek Bridge, Sediment Removal Project",NOE,10/10/2008,10/10/2008,"The bridge is located approximately one mile upstream from Humboldt Bay. This low gradient reach of Jacoby Creek accumulates excess sediment. The results of a recent stream channel assessment indicate that approximately 900 cubic yards of additional sediment has accumulated under the bridge area since the bridge was installed in 1988. Most of the excess sediment had deposited on the upper stream banks near the bridge abutments. The accumulated sediment is contributing to more frequent flooding in the area which sometimes causes Old Arcata Road to be closed to through traffic. The project involves removal of approximately 300 cubic yards of the accumulated sediment. Sediment removal activities will occur on both sides of the creek channel. Sediment removal activities will be confined within two areas that extended approximately 30 feet away from the abutments and 60 linear feet parallel to the stream channel. The excavation areas will extend approximately 12 feet beyond the edges of the bridge deck in both the upstream and downstream directions. The sediment removal areas are located above the flowing portion of the stream channel. Sediment will be removed to an average depth of two to three feet below the existing ground surface. Excavated sediment will be loaded into dump trucks and relocated to an offsite upland location. ",https://ceqanet.opr.ca.gov/2008108125,"Humboldt Co. DPW - Jacoby Creek Bridge, Sediment Removal Project",Dean Prat,"Regional Water Quality Control Board, Region 1 (North Coast), Sa",N/A,,"5550 Skylane Boulevard, Suite A",,Santa Rosa,CA,95403,7075762801,,,Humboldt,,,,,,,,,,,,,,,,,Categorical Exemption,Section 15301,The project involves maintenance of an existing bridge and topographical features involving no expansion of use.,,,,,,,,,,,,