SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2008101073,Alameda Corridor-East Construction Authority,,ACE,San Gabriel Trench Grade Separation Project,FIN,12/20/2010,,"NOTE: 1 CD The Alameda Corridor-East Construction Authority (ACE) proposes to eliminate 4 at-grade railroad crossings along the Union Pacific Railroad (UPRR) in the City of San Gabriel. These improved crossings would occur at Ramona Street, Mission Drive, Del Mar Avenue, and San Gabriel Boulevard. Currently the 2.2 mile stretch of railroad includes 4 at-grade crossings with no grade separations between the railroad and vehicles or pedestrians. The proposed project would lower the existing railroad from its current at-grade condition into a trench. Although the actual trench would be located within the City of San Gabriel, construction activities and some limited track work would take place in the Cities of Alhambra, Rosemead and the County of Los Angeles.",https://ceqanet.opr.ca.gov/2008101073/3,San Gabriel Trench Grade Separation Project,Regina Talamentez,Alameda Corridor-East Construction Authority,N/A,,"4900 Rivergrade Road, Suite A120",,Irwindale,CA,91706,6269629292,34°05'44"N 110°06'32"W,San Gabriel,Los Angeles,,"Ramona St, Mission Rd, Del Mar Ave, San Gabriel Blvd",91776,2.2 miles,Several,I-10,Alhambra Wash and Rubio Wash,None,No,,,Transportation,Site Plan,"Aesthetics, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Sewer Capacity, Solid Waste, Transportation, Wetland/Riparian, Wildfire",,,,,,,,,,,,,,,,,