SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2008101035,Riverside County Redevelopment Agency,,,Cabazon Wastewater Facilities Project,MND,10/7/2008,,"The Cabazon Wastewater Facilities Project (Project) consists of constructing and operating regional wastewater system facilities that are intended to serve the community of Cabazon. Project facilities are described in detail in the project Initial Study. Phase I facilities, anticipated for construction within the next one to two years, consist of Trunk Sewer A (a 12-inch to 15-inch diameter gravity sewer to be constructed within the public street rights-of-way of Carmen Avenue, Almond Street, Dolores Avenue, and in Cabazon Water District [CWD]-owned property with Assessor's Parcel Number [APN] 525-107-009) and two 6-inch to 8-inch diameter sewer laterials. Phase II, anticipated for construction within the next one to two years, including either a Wastewater Treatment Plant located within CWD-owned property (APN 525-170-009) or an Interim Lift Station located within APN 525-170-009 and the Elm Street Force Main, which would extend northerly therefrom within Elm Street, then connect to an existing 8-inch diameter force main at the existing Arrowhead Water Bottling Plant. Said existing 8-inch diameter force main currently conveys watewater from the Arrowhead Water Bottling Plant to an existing wastewater treatment plant that is owned and operation by the Morongo Band of Mission Indians and is located just north of Interstate 10. If this alternative is selected, wastewater flows conveyed through the Elm Street Force Main would be treated at said existing wastewater treatment plant.",https://ceqanet.opr.ca.gov/2008101035,Cabazon Wastewater Facilities Project,Andy Frost,Riverside County Redevelopment Agency,N/A,,"1325 Spruce Street, Suite 400",,Riverside,CA,92507,9519558916,33°54'38.19"N 116°47'13.74"W,Riverside,Riverside,,"Apache Trail on the west, Elm Street on the east, Esperanza Avenue on the south",92230,15,"525-170-009 , 525-170-015",I-215,"San Gorgonio River,Cabazon Channel,Smith Creek,Twin Pines Creek,Millard Canyon,Deep Canyon,",Banning Municipal,Yes,10/7/2008,11/5/2008,Other,,,,,,,,,,,,,,,,,,,