SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2008091026,San Luis Obispo County,,,Topaz Solar Farm Project,NOD,1/6/2012,1/6/2012,"The Project includes installing and operating arrays of photovoltaic modules and associated electrical production and transmission infrastructure. The Project will tie directly into the existing Pacific Gas and Electric Morro Bay/Midway 230 kV transmission line. Project construction will take approximately three years. The Project will result in impacts to 3,510 acres of San Joaquin Kit fox habitat. The Project is expected to result in incidental take of San Joanquin kit fox, which is designated as a threatened species under the California Endangered Species Act. The incidental take permit for this Project, as issued by the Department of Fish and Game, authorizes incidental take of species listed under CESA that may occur as a result of Project implementation. Minor Amendment 3 to the ITP extends by 20 additional days the time period to transfer fee title to DFG or record conservation easement for the Phase 1 habitat mitigation lands. The activities covered in the ITP and the extent of habitat compensation lands is unchanged.",https://ceqanet.opr.ca.gov/2008091026/14,Topaz Solar Farm (Optisolar) Conditional Use Permit (DRC2008-00009),Dave Hacker,DFG Central Region (4),N/A,,1234 East Shaw Avenue,,Fresno,CA,93710,8055946152,35°25'3.143"N 120°4'3.937"W,,San Luis Obispo,,Hwy. 58 and Bitterwater Road,,9.7 sq.mi.,,Hwy 58,,,,,,,,,,,,,,DFG ,No,1/5/2012,No,Yes,No,,Yes,,,Yes,"County of San Luis Obispo Department of Planning & Building San Luis Obispo, CA 93408"