SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2008088049,Central Valley Flood Protection Board,,,Folsom D Safety and Flood Damage Reduction Joint Federal Project-Resident Office Relocation,NOE,8/5/2008,8/5/2008,"The existing Folsom resident office and its appurtenances will be moved from its current location near Folsom Dam along with all site features and utilities to a location on Folsom Prison property about ¼ mile away. Work will include all materials above and below grade except the leach field. An aluminum space frame, about 30' by 60' located northeast of the resident office building will also be removed and salvaged.",https://ceqanet.opr.ca.gov/2008088049,Folsom D Safety and Flood Damage Reduction Joint Federal Project-Resident Office Relocation,Annalena Bronson,Central Valley Flood Protection Board,N/A,,"3310 El Camino Avenue, LL-40",,Sacramento,CA,95821,9165740369,,Folsom,Sacramento,,,,,,,,,,,,,,,,,Categorical Exemption,"Sec.15301(l),Sec.15303(c)","Demolition of small structure Construction of small structure The Folsom Residential office current location will become inaccessible during the construction of the Joint Federal project spillway. It was constructed when the Folsom Dam Modifications Project contemplated modifications to Folsom Dam itself. No potential impacts have been identified. The existing structure will be deconstructed and moved to the new site. The new site has been used for placement of excavated material that has been shaped into a building pad. All impacts from the initial construction of the existing structure have been mitigated. No additional environmental impacts have been identified. ",,,,,,,,,,,,