SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2008068247,"Water Resources, Department of",California Department of Water Resources,DWR,Chrisman Water Treatment Plant Waterline Installation Project,NOE,6/18/2008,6/18/2008,"The Chrisman Water Treatment Plant Waterline Installation Project will connect to the distribution system of the nearby water purveyor- Tejon Castaic Water District. The installation of the total length of 1800 ft. of 2.5-inch galvanized steel pipe and 2.5-inch PVC pipe from the exiting Tejon Castaic Water District pump located at MP 285.01 (turnout WRM12) to the Chrisman water storage tank includes minor trenching, pipeline installation and connections followed by backfilling activities. The project will take place on the Department of Water Resources easements and the surface area will be restored to original easement conditions. The Department of Water Resources staff working at the Chrisman facility will benefit from this project by receiving a reliable source of drinking water. Additionally, bringing the Chrisman Water Treatment Plant system into compliance with the State Drinking Water Standards minimizes the public health threat by providing pure, wholesome, healthful, and potable water. The Chrisman Water Treatment Plant Waterline Installation Project will be performed within August 2008-August 2009. ",https://ceqanet.opr.ca.gov/2008068247,Chrisman Water Treatment Plant Waterline Installation Project,Curtis Johnston,California Department of Water Resources,N/A,,1416 Ninth Street,,Sacramento,CA,94236-0001,6618585666,,,Kern,,,,,,,,,,,,,,,,,Categorical Exemption,"Type 4, Section 15304","No environmental impacts are anticipated as a result of the Chrisman Water Treatment Plant Waterline Installation Project. Since the installation activities are to take place on the Department of Water Resources easements, no vegetation or animal species exist within the project site.",,,,,,,,,,,,