SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2008052009,Sacramento Municipal Utility District,,,Union Valley Bike Trail Phase 2 (Streambed Alteration Agreement EPIMS Notification No. ELD- 15909-R2),NOD,9/17/2021,9/17/2021,"The project is limited to the construction of two culverts along approximately 4.6 miles of a bike trail near the shore of the Union Valley Reservoir between Wolf Creek Campground and West Point Campground. An open-bottom aluminum arch culvert (span of 24 feet and 22.5 feet long) will be used to accommodate the trail crossing at a perennial stream. Construction of the culverts will require the removal of two lodgepole pines (Pinus contorta ssp. murrayana), one 10 inches diameter at breast height (dbh), and one 17 inches dbh. A 27- foot long, 18-inch-wide corrugated metal pipe culvert will be installed in the channel of intermittent stream (IS- 1) to the west of the Wolf Creek Group Campground. This will include installation of an inlet/outlet rock transitions (up to 6 inches deep) measuring 10 feet long (extending out from the culvert) by 12 feet wide at the inlet and outlet of the culvert.",https://ceqanet.opr.ca.gov/2008052009/13,"Upper American River Project (UARP) Relicensing, Including a New Pumped-storage Development",Caitlyn Oswalt,CDFW,N/A,caitlyn.oswalt@wildlife.ca.gov,1701 Nimbus Road,,Rancho Cordova,CA,95670,9163581163,38°52'58.3"N 120°25'57.5"W,,El Dorado,El Dorado,,,,,,Union Valley Reservoir,,,,,,,,,,,,,Department of Fish and Wildlife,No,9/16/2021,No,Yes,No,,Yes,Yes,No,Yes,at the office location listed above for the Lead Agency. CDFW’s record of execution of the above Lake and Streambed Alteration Agreement as Responsible Agency is available at CDFW’s regional office.