SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2008051003,"Toxic Substances Control, Department of",Department of Toxic Substances Control,,PG&E Topock Compressor Station Environmental Investigation and Cleanup Project,SIR,1/12/2017,,"Groundwater beneath and near the Topock Compressor Station (TCS) has been contaminated by chemicals associated with historical wastewater discharge from station operations related to compression of natural gas in areas known as Bat Cave Wash and East Ravine. The Groundwater Remediation Project, as analyzed and approved in the 2011 Groundwater FEIR and the 2013 Addendum to the EIR, involves manipulation of subsurface water flow to move a contaminated groundwater plume with Cr(VI) and other chemicals of potential concern, originating from past operations at the TCS, through a treatment zone. ",https://ceqanet.opr.ca.gov/2008051003/7,Subsequent Environmental Impact Report for the Topock Compressor Station Final Groundwater Remediation Project,Mr. Aaron Yue,Department of Toxic Substances Control,N/A,,Geological Services Branch,5796 Corporate Ave.,Sacramento,CA,90630,7144845439,34°43'15"N 114°29'45"W,Needles,San Bernardino,,National Trails Highway,92363,128.5,Various,"SR 66, I-40",Colorado River,,Yes,1/12/2017,2/27/2017,Waste Treatment,,"Aesthetics, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Noise, Vegetation, Wetland/Riparian",,,,,,,,,,,,,,,,,