SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2008041111,"San Diego, City of",City of San Diego,,Nancy Ridge TM NDP,NOD,2/27/2023,2/27/2023,"TENTATIVE MAP (TM) and a NEIGHBORHOOD DEVELOPMENT PERMIT (NDP) for the construction of four light industrial warehouse buildings totaling 89,750 square feet on a 5.35-acre parcel previously approved for a laydown area as part of the Nancy Ridge Business Park, located at 5909 Nancy Ridge Drive (Proposed Project). The Proposed Project also includes vehicular parking and installation of utility infrastructure to City standards. The Proposed Project site is in the IL-2-1 (Industrial-Light) zone of the Mira Mesa Community Plan, Residential Tandem Parking Overlay Zone, Marine Corps Air Station Miramar Airport Influence Area, Accident Potential Zone 2, Airport Environs Overlay Zone, FM Part 77 Notification Area, Environmentally Sensitive· Lands, and Floodway-100 and Floodplain-100 Zones. The Nancy Ridge Business Park Project (Approved Project) was approved by the City of San Diego in 2008. The Approved Project proposed the construction of a paved, non-standard access 30-foot-wide driveway and internal 40-foot wide right-of-way with a sidewalk from Nancy Ridge Drive to an outdoor storage area consisting of two graded pad areas. Both pads were proposed to be covered with Class 2 base gravel material. Evaluation of the Approved Project in the adopted MND included grading of approximately 58,000 cubic yards of cut with a maximum cut height of 34 feet and a maximum cut slope height of 34 feet with a maximum cut slope ratio of 2:1. The Approved Project includes a total fill quantity of approximately 58,000 cubic yards with a maximum fill depth of 36 feet and a maximum fill slope height of 30 feet with a maximum fill slope ratio of 2:1. Due to the topography of the site, the Approved Project includes approximately 2,800 feet of keystone retaining walls to stabilize the proposed step-down, fiat pad areas, and the non-standard driveway. The retaining walls were approved at a maximum height of 31 feet, to be screened with drought tolerant, native plant species that conform to the City's Landscape Technical Manual. The Approved Project also includes installation of drainage, including a Modular Wetland System, an underground storage system, and storm drain. The Approved Project includes construction Best Management Practices (BMPs) and post-construction BMPs consistent with the City of San Diego requirements. In approving the Approved Project, the City also adopted the Nancy Ridge Business Park Mitigated Negative Declaration No. 114358 (adopted MND). The adopted MND determined that, with the incorporation of mitigation measures, the Approved Project would not result in any significant and unavoidable environmental impacts. Pursuant to Public Resources Code Section 21166 and CEQA guidelines 15162 and 15163, the City has determined that: (1) there is substantial evidence that none of the conditions requiring preparation of a subsequent or supplemental EIR or subsequent Negative Declaration/Mitigated Negative Declaration exist, and (2) the City will rely on the previous environmental document, which adequately addresses this project.",https://ceqanet.opr.ca.gov/2008041111/3,Nancy Ridge Business Park,Courtney Holowach,City of San Diego,Planner,CHolowach@sandiego.gov,1222 1st Avenue,,San Diego,CA,92101,6194465187,,San Diego,San Diego,San Diego,,,,,,,,,,,,,,,,,,,City of San Diego,Yes,7/20/2022,No,No,No,,No,No,No,,"Development Services Department, 1222 First Avenue, San Diego, CA 92101"