SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2008041009,"University of California, Merced",,,"University of California, Merced 2020 Project Site Boundary Change",NOD,8/30/2017,8/30/2017,"Project consists of a boundary change for the Merced 2020 Project site to include the approx. 4.84 acre P3 construction staging and parking area located northeast of the North Bowl parking lot, and exclude a triangular area located between Le Grand Canal and Fairfield Canal and a second triangular located to the east of Fairfield Canal. The project results in a decrease in total site area from 153.4 to 143.7 acres. The boundary change encompasses the alignment of a proposed roadway that would be constructed from the 2020 project site east of the Fairfield Canal to the P3 area. This road will be paved and used to access the P3 area during 2020 project construction, and remain in place as part of the final 2020 Project. The project also relocates portions of a previously installed CA Tier Salamander exclusion fence to align with the modified 2020 Project site boundary. The Project will install the new segment of the CTS fence prior to removing the affected segment of the CTS fence.",https://ceqanet.opr.ca.gov/2008041009/23,"University of California (UC) Merced and University Community Plan, UC Merced Phase 2 Campus",Phillip Woods,"University of California, Merced",N/A,,5200 N. Lake Road,,Merced,CA,95340,2093492561,,Merced,Merced,,Yosemite Avenue at Lake Road,95343,,,SR140,"Le Grand Canal, Fairfield Canal",,,,,,,,,,,,,University of California ,Yes,8/16/2017,No,Yes,No,,Yes,,Yes,Yes,"5200 N. Lake Road, Merced, CA 95340"