SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2008032062,"Water Resources, Department of",California Department of Water Resources,DWR,California WaterFix Final EIR/EIS (California Endangered Species Act Incidental Take Permit No. 2081-2016-055-03 (ITP)),NOD,7/27/2017,7/27/2017,"Project includes construction of new water conveyance facilities to divert water from the Sacramento River in the north Sacramento-San Joaquin Delta (Delta) to south Delta pumping plants. Water will be conveyed through two underground tunnels to Clifton Court Forebay (CCF). The project also includes modification and expansion of CCF, modification of existing south Delta pumping facilities, and construction of a new Head of Old River Gate. After Project construction is complete and the new facilities become operational, the project includes operation of both new and existing water conveyance facilities in the State Water Project., including coordinated operations with the U.S. Bureau of Reclamation through the joint Central Valley Project (CVP)/SWP facilities in the Delta. the project also includes ongoing maintenance of Project transmission lines. The Project will enable join management fo new north and existing south Delta water diversions, collectively called dual conveyance.",https://ceqanet.opr.ca.gov/2008032062/7,California WaterFix Draft Supplemental EIR/EIS,Carl Wilcox,CDFW,N/A,,"1419 9th St., 12th Floor",,Sacramento,CA,95814,7077384134,,Stockton,"Contra Costa, Sacramento, San Joaquin, Solano, Yolo",,,,,,,,,,,,,,,,,,,,CDFW ,No,7/26/2017,No,Yes,No,,Yes,,No,Yes,"830 S Street, Sacramento, CA 95811"