SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2008022151,Sacramento Municipal Utility District,,,Rancho Seco Power Plant Wastewater Treatment Artificial Wetland Project,MND,2/29/2008,,"Construct and modify the Rancho Seco Power Plant wastewater treatment and disposal system by creating an artificial wetland that would provide additional wastewater treatment and create additional wastewater storage. The artificial wetland would be constructed in one of two existing, concrete-lined service spray basins (measuring 330 by 165 feet at the bottom) that were previously used for cooling non-radioactive water at the plant. The basin would be divided into three cells, with two vegetative cells located next to each other and a third cell for water storage. Treated wastewater would be conveyed to the wetland in the first cell, allowed to flow by gravity through the wetland, then to the second cell, and any remaining water would be directed to the storage cell (later phase also to the second basin), and then to a 1.5 acre irrigation area.",https://ceqanet.opr.ca.gov/2008022151,Rancho Seco Power Plant Wastewater Treatment Artificial Wetland Project,Ron Scott,Sacramento Municipal Utility District,N/A,,"P.O. Box 15830, MS B203",,Sacramento,CA,95852-1830,9167325114,38°20'27.40"N 121°6'37.10"W,Galt,Sacramento,,Twin Cities Road and Clay Station Road,95638,1.75,"1400-0500-009, 008, 010, 011, 013",104,"Clay Creek, Hadselville Creek, Laguna Creek",,No,2/29/2008,4/1/2008,Waste Treatment,,"Air Quality, Biological Resources, Cultural Resources, Drainage/Absorption, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Noise, Public Services, Wetland/Riparian",,,,,,,,,,,,,,,,,