SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2008011046,Azusa Redevelopment Agency,,,Target Store Redevelopment Project,NOD,8/8/2008,8/8/2008,"The proposed project would develop an approximately 168,000-square-foot Target retail store, including 420 parking spaces. The proposed project would reach two stories in height. The Target sign tower, located above the main store entrance, would reach approximately 69 feet in height. Parking spaces and a receiving and loading dock would be located at-grade beneath the main sales and storage floor located on the second level. Additional angled parking spaces would be provided by the City and located adjacent to the project site, along San Gabriel Avenue. Vehicles would access the at-grade parking area from 9th Street, Azusa Avenue, and San Gabriel Avenue. Trucks would access the receiving and loading dock by entering on San Gabriel Avenue and exiting on Azusa Avenue. Several mature Coast Live Oak trees located on the east side of San Gabriel Avenue would be protected in place or removed and replaced per City ordinance. The proposed project would require an overlay zone, which would allow for additional building height, reduced parking stall size, and building articulation. Approximately 47,646 square feet of existing commercial and industrial buildings on the project site would be demolished with the construction of the proposed project.",https://ceqanet.opr.ca.gov/2008011046/3,Target Store Redevelopment Project,Suan Cole,City of Azusa Redevelopment Agency,N/A,,213 E. Foothill Boulevard,,Azusa,CA,91702,6268125226,,Azusa,Los Angeles,,"9th Street and San Gabriel Avenue, 9th Street, Azusa Avenue",91702,4.10,8608-024-903,"210, 39, 66","Dalton Wash, San Gabriel River, San Dimas Wash",,,,,,,,,,,,,City of Azusa ,Yes,8/4/2008,Yes,Yes,No,,Yes,,Yes,Yes,"Azusa City Clerk's Office and Planning Division 213 E. Foothill Boulevard Library 729 N. Dalton Avenue "