SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2008011040,Western Municipal Water District,,,Dauchy / JFK Creek Crossing Project,NOD,6/13/2008,6/13/2008,"A new 12-inch diameter waterline is proposed to replace an existing 12-inch diameter waterline on John F. Kennedy Drive. The existing waterline is located underground and below the creek bed, and now faces accessibility problems and severe corrosion due to it being below the water table. John F. Kennedy Drive is currently a dirt road between Dauchy Avenue and Louis Pasteur Drive. The proposed pipeline will be located underground except where it crosses over the drainage feature (known as the Dauchy Creek) that is qualified as a jurisdictional water of the U.S. as defined with Section 1600 of the California Fish and Game Code. The District is proposing to keep the pipeline at a level that may allow for a future bridge that is proposed by the City of Riverside. The suspended pipeline will be suspended approximately 14 feet above the bottom of the Dauchy Creek. The suspended portion of the pipeline will be a 12-inch diameter pipeline within a 30-inch diameter steel encasement. Security measures (such as barbed wire fencing) to prevent people from walking on, climbing on, or defacing the pipeline will be incorporated. Future maintenance activities of the suspended pipeline may include painting over and trimming of tree branches.",https://ceqanet.opr.ca.gov/2008011040/2,Dauchy / JFK Creek Crossing Project,Derek Kawaii,Western Municipal Water District,N/A,,450 Alessandro Boulevard,,Riverside,CA,92506,9517895000,,Riverside,Riverside,,John F. Kennedy Drive and Dauchy Avenue,92504,10,,,Dauchy Creek,,,,,,,,,,,,,Western Municipal Water District ,Yes,6/4/2008,No,No,No,,Yes,,No,No,"Western Municipal Water District 450 Alessandro Boulevard Riverside, CA 92506"