SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2007122046,Central Valley Flood Protection Board,,,"Lower American River Mile 0.5 Mitigation Site, Sacramento River Bank Protection Project",MND,12/14/2007,,"Construction of the project would involve creating seasonally inundated floodplain habitat for salmonids and delta smelt listed under the Federal Endangered Species Act by excavating and lowering the existing American River Right Bank (RM 0.5) in the American River Parkway, shaping terraced benches, and incorporating in-stream woody material at the summer-fall water-surface elevations. In addition, a native plant restoration program would be implemented in the newly created habitat to improve the habitat and scenic value of the area. The project would occur in two phases with transplanting in winter of 2008 and construction in summer and fall of 2008.",https://ceqanet.opr.ca.gov/2007122046,"Lower American River Mile 0.5 Mitigation Site, Sacramento River Bank Protection Project",Deborah Condon,Reclamation Board,N/A,,"2825 Watt Avenue, Suite 100",,Sacramento,CA,95821,9165741426,,Sacramento,Sacramento,,"In American River Parkway, right bank of American River just upstream of I-5",95833,8.3,"274-0050-015, 017",I-5 and SH 160,American River and Sacramento River,,Yes,12/17/2007,1/15/2008,Other,,"Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Flood Plain/Flooding, Geology/Soils, Hydrology/Water Quality, Noise, Recreation, Transportation, Vegetation, Wetland/Riparian",,,,,,,,,,,,,,,,,