SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2007122044,"Elk Grove, City of",City of Elk Grove,,Safe Routes to School - Bridge Over Laguna Creek,MND,12/14/2007,,"The proposed project includes construction of an approximately 277-foot long off-street bicycle/pedestrian/equestrian bridge over Laguna Creek between Ringe Circle and Porto Rosa Drive, approximately 75 feet upstream of the existing low-water crossing. The bridge will be a pre-fabricated steel truss bridge structure with a cast-in-place concrete decking. The concrete deck, with an overall bridge width of 13-feet 8-inches, will be divided into two equal spans with concrete abutments on either side of the bridge each having two 3-foot diameter cast-in-drilled-hole (CIDH) piles and a single 8-foot diameter center pier, to be placed within Laguna Creek. Asphalt concrete (AC) paving will be installed on both ends of the new bridge structure to tie into the existing multi-use trail. Prior to construction, vegetation will be cleared from the upland work area and the existing low-water crossing and drainage pipes would be removed. Upon project completion, the project area will be re-vegetated with native species. No additional right-of-way acquisition will be required to accommodate the proposed improvements nor does it include a lighting component at this time.",https://ceqanet.opr.ca.gov/2007122044,Safe Routes to School - Bridge Over Laguna Creek,Marieka Schrader,City of Elk Grove,N/A,,8401 Laguna Palms Way,,Elk Grove,CA,95758,530-750-7076 x207,,Elk Grove,Sacramento,,Laguna Creek between Ringe Circle and Porto Rosa Drive,95624,0.8,,99,Laguna Creek,Sunset Sky Ranch/Elk Grove,No,12/14/2007,1/18/2008,Transportation,,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Noise, Public Services, Recreation, Schools/Universities, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian",,,,,,,,,,,,,,,,,