SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2007121083,Coachella Valley Water District,,CVWD,Well 6808-1,NEG,12/18/2007,,"The Well 6808-1 project site includes a 0.75-acre site for the proposed well, pumping plant, and detention basin as well as a 30-foot wide, 1,325-foot long easement along Hernandez Lane (dirt road) that extends north to Airport Boulevard. About 1,300 feet of 12-inch water transmission pipeline and a gravel access road will be constructed within the easement. An existing residential structure constructed of cement block and stucco is located along the Hernandez Lane easement about 150 feet south of Airport Boulevard. This structure will be demolished as part of the well construction activities. In order to connect Well 6808-1 to the existing domestic water system, about 1,400 feet of 18-inch water transmission pipeline will be constructed within the Airport Boulevard right of way (Riverside County right of way) that will extend from Hernandez Lane eastward to Apollo Lane. Project construction includes drilling, casing, testing, and developing a 2,000-gallon-per-minute (gpm) domestic water well and pumping plant to the domestic water distribution system. A six-foot masonry wall will be constructed around the 0.75-acre well site. The purpose of the Well 6808-1 project is to provide additional domestic water service and fire flow to the Thermal Pressure Zone which includes the Thermal area. Well 6808-1 will also supplement water supplies to the Salton City area in future years.",https://ceqanet.opr.ca.gov/2007121083,Well 6808-1,Luke Stowe,Coachella Valley Water District,N/A,,85-995 Avenue 52,,Coachella,CA,92236,7603982651,,,Riverside,,Airport Boulevard and Van Buren Street,92274,1.0,759-020-027,"State Routes 86, 111",Coachella Valley Stormwater Channel,Thermal,Yes,12/18/2007,1/16/2008,Water Facilities,,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Cultural Resources, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Noise, Public Services, Transportation, Vegetation, Wildlife",,,,,,,,,,,,,,,,,