SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2007111005,"Victorville, City of",City of Victorville,,Spring Valley Parkway Re-Alignment,MND,11/1/2007,,"This project will consist of re-aligning approximately 1,500 LF of existing roadway to improve current traffic circulation, decrease congestion, accidents and mitigate traffic impacts due to future development. Ultimately this project will ensure the safety of our citizens by eliminating the two offset intersections and creating a four way intersection at the Peach Avenue and Bear Valley Road intersection. The re-alignment will be done on the southern portion of the existing Spring Valley Parkway, from the San Bernardino County (SBC) boundary line, located approximately 500 feet south from Huerta Street, to Bear Valley Road. This project will provide a new five-lane road, two lanes in each direction plus a middle two-way left turn lane. Peach Avenue is located approximately 500 ft west from the existing Spring Valley Parkway/Bear Valley Road intersection. The existing roadway will not be fully decommissioned. Right turning movements from Bear Valley Road westbound onto Spring Valley Parkway as well as right turning movements from the existing Spring Valley Parkway southbound will be allowed. All other turning movements will not be allowed by re-stripping and tapering. In addition, the current traffic signal at Spring Valley Parkway and Bear Valley Road will be relocated to the proposed Peach Avenue intersection. The Project will go through vacant privately owned property for which the City will obtain right of way.",https://ceqanet.opr.ca.gov/2007111005,Spring Valley Parkway Re-Alignment,John A. McGlade,City of Victorville,N/A,,14343 Civic Drive,,Victorville,CA,92393,7609555160,,Victorville,San Bernardino,,"Bear Valley Road, Spring Valley Parkway, Francesca Rd. and Lindero Rd.",92395,,,Interstate 15,Mojave River,,Yes,11/1/2007,11/30/2007,Transportation,,"Air Quality, Biological Resources, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Noise",,,,,,,,,,,,,,,,,