SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2007101141,"Carlsbad, City of",City of Carlsbad,,El Camino Real Widening; Tamarack Avenue to Chestnut Avenue,NOD,4/23/2010,4/23/2010,"The project will widen the section El Camino Real from Tamarack Avenue north to Chestnut Avenue to its full width of six travel lanes. The Project will widen the roadway to a total width of 126 feet including 8-foot wide bike lanes on both sides of the street, three southbound lanes of 12-foot width each, an 18-foot wide landscaped median island, and three northbound lanes of 12-foot width each at the southern and northern ends of this project. In the middle section of the roadway, the roadway would transition between the previously discussed typical section to a modified width of 116 feet including a 6 1/2 foot bike lane on the west side of the roadway, three southbound lanes of 12 feet width each, a 14-foot-wide landscaped median island, three northbound lanes of 11 1/2 feet width each, and a five-foot bike lane on the east side of the roadway. Parkways consisting of 5 1/2 feet of sidewalk and 4 1/2 feet of native vegetation (including bio-swale) would be provided on each side of the roadway resulting in a right-of-way width of 116 feet in this reach of the roadway. The Project proposes to keep the existing vertical profile of the road. The Project also includes improvements to the intersection of El Camino Real and Chestnut Avenue; replacement or improvement of storm drains; placement of erosion protection and/or construction of check dams; construction of 12- to 24-inch-deep brow ditches along the west side of El Camino Real; installation of lighting at 300-foot intervals along both sides of El Camino Real; construction of retaining walls; and relocation of an existing bus stop. Existing overhead power lines along the west side of El Camino Real may be underground. ",https://ceqanet.opr.ca.gov/2007101141/3,CDP 07-22 / HDP 07-02 / SUP 07-04 / HMPP 07-08 - El Camino Real Road Widening,Darren Bradford,Department of Fish and Game,N/A,,South Coast Region,4949 Viewridge Ave,San Diego,CA,92123,8584674223,,Carlsbad,San Diego,,Tamarack & Chestnut,,,,78,"Buena Vista Lagoon, Agua Hedionda Lagoon, Pacific Ocean",McClellan/Palomar,,,,,,,,,,,,Department of Fish and Game ,No,4/23/2010,No,No,Yes,,Yes,,No,No,"City of Carlsbad 1635 Faraday Avenue Carlsbad, CA 92008"