SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2007082091,Mid-Coastside Sewer Authority,,,Wet Weather Flow Management Project,MND,1/29/2009,,"The proposed project consists of installing two parallel, approximately 700-foot, 60-inch-diameter reinforced concrete under ground storage pipes to temporarily store excess sewage during peak flows or a storm event. The project site is located within a grassy field area known as Burnham Strip, between Highway 1 (Cabrillo Highway) and El Granada, from Coronada Avenue to Capistrano Road. As the peak flows subside, the sewage would drain from the pipes by gravity to the Portola Pump Station wet well. The storage pipes would be installed immediately east of the Montara interceptor pipeline, and would provide approximately 205,000 gallons of storage. An approximately 15-inch-diameter pipeline would connect witht he existing 15-inch Montara Interceptor.",https://ceqanet.opr.ca.gov/2007082091/2,Wet Weather Flow Management Project,John Foley III,Sewer Authority Mid-Coastside (SAM),N/A,,1000 N. Cabrillo Highway,,Half Moon Bay,CA,94019,6507260124,,Half Moon Bay,San Mateo,,"Between Highway 1 and Obispo Road, from Coronado Ave. and Capistrano Rd.",,,,Carbillo Highway,,,No,1/29/2009,2/27/2009,Other,,"Air Quality, Biological Resources, Cultural Resources, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Noise, Public Services, Schools/Universities, Transportation",,,,,,,,,,,,,,,,,