SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2007051067,Caltrans 8 (San Bernardino),"California Department of Transportation, District 8",,State Route 58 (SR-58) Hinkley Expressway Projecct (California Endangered Species Act Incidental Take Permit No. 2081-2013-071-06 (ITP)),NOD,6/27/2014,6/27/2014,"The project involves the realignment and widening of SR58 from a two-lane roadway to a 4-lane expressway/freeway from PM 21.8 west of Hidden River Rd near Hinkley and eastward to PM 31.1 0.775 miles east of Lenwood Rd. During construction, one lane of the current SR-58 will be closed and the terminal half mile at each end of the project will be used for staging. Outside the project area, there will be no off-road travel or parking areas. Access to the work areas will be gained through the use of existing easements on SR-58, which gives full access to the proposed realignment and widening areas. The staging areas involved with this project will be located along the proposed right of way of the new alignment of SR-58. Crossings at Valley View Road, Summerset Road, and Hinkley Road will be modified to have full standard shoulder and traveled way widths, and Hinkley and Summerset Road will have left-turn pocket lanes. Expressway access will be at Hinkley Road, and the Lenwood Interchange. All other roads bisecting the expressway will be converted to cul-de-sacs and permanent desert tortoise fencing will be installed to protect the species from road-related mortalities. Drainage facilities will be located on site in the form of two detention/retention basins. One basin would be located west of Valley View Road, south of the new SR-58 and the other basin would be located west of Lenwood Road between the existing alignment of SR-58 and the realigned portion. Approximately 22 culverts will be designed as box culverts (with minimum dimension of three by five feet) 7 of which will function as wildlife crossings for the desert tortoise and other species.",https://ceqanet.opr.ca.gov/2007051067/7,State Route 58 Hinkley Expressway Project,Heather Weiche,California Department of Fish and Wildlife,N/A,,3602 Inland Empire Blvd Suite 200,,Ontario,CA,91764,9099808607,34°55'30"N 117°10'30"W,Barstow,San Bernardino,,Hidden River Road and Lenwood Road,92347,757,"049403110, 049403111, 049420101",Hwy 58,Mojave River,,,,,,,,,,,,,Calfiornia Department of Fish and Wildlife ,No,6/26/2014,No,Yes,No,,Yes,,No,Yes,"CDFW Inland Deserts Region, 3602 Inland Empire Blvd Suite 200, Ontario, CA 91764"