SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2007042078,Shasta County,,,Use Permit 06-016 Hatchet Ridge Wind Project,FIN,6/26/2008,,"The applicant, Hatchet Ridge Wind, LLC, proposes to construct a wind energy project. The area actually covered by the project would be an approximately 73-acre portion of the 17 parcels. The project would produce approximately 100 megawatts of electricity and would require construction of 42 to 68 wind turbines on steel tubular towers from about 213 feet to 263 feet tall. The total height of each tower with its attached wind turbine could reach from about 338 feet to about 418 feet high. The line of towers would stretch for about 6.5 miles northeasterly along the ridge of Hatchet Mountain. The project would include transmission lines from the turbines to a new substation and additional lines to interconnect with existing high-voltage transmission lines that cross the project site and which are owned by Pacific Gas and Electric Company. The project would also include a temporary construction office, an operations and maintenance building/control center, new access roads, temporary staging areas, and up to four permanent meteorological masts up to 220 feet high. The project would be constructed over a 6 to 12-month period. In general, the towers would be constructed in areas managed for commercial timber production which were replanted after the 1992 Fountain Fire.",https://ceqanet.opr.ca.gov/2007042078/3,Use Permit 06-016 Hatchet Ridge Wind Project,Bill Walker,Shasta County Department of Resource Management,N/A,,"1855 Placer Street, Suite 103",,Redding,CA,96001,5302255532,,,Shasta,,Bunch Grass Lookout Road and State Highway 299 East,96013,73,"027-120-004, 007, 008; 030-010-008, 009; 030-030-001, 003, 004, 005, 008, 010, 011, 015, 016, 01",299 East,"Lake Margaret, Carberry Creek, Goose Creek, Hatchet Creek, Little Hatchet, Roaring Creek",,No,,,Power,Use Permit,"Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Noise, Transportation, Wetland/Riparian, Wildfire, Wildlife",,,,,,,,,,,,,,,,,