SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2007021136,San Benito County Water District,,,Addendum to the San Benito County Water District Reclaimed Water Storage Pond Project Subsequent EIR,NOD,2/2/2016,2/2/2016,"The project involves modifying the existing Pond #2 of the seasonal storage reservoir at the City of Hollister Domestic Waste Reclamation Facility (DWRF), the construction of which was analyzed in the 2006 EIR. This storage area would consist of a 9.02 AF, lined interior pond system with associated pipelines constructed within the existing, disturbed Pond #2 (Project Modifications). New pipelines and diversion structures would enable the control of water into and out of the proposed 9.02-AF pond, and would include approximately 320 ft of 20-in pump return pipeline and a gate, as well as an approximately 120-ft long, 18-in overflow pipeline. In addition, survey crest monuments, and a reservoir level gauge would be installed to monitor any settlement of the new embankments and water pressures/levels. Further, perimeter chain link fence, and bird distraction system consisting of netting or wire with reflective tape will be installed.",https://ceqanet.opr.ca.gov/2007021136/11,San Benito County Water District Recycled Water Facility Phase I Demonstration Project,Jeff Cattaneo,San Benito County Water District,N/A,,PO Box 95024,,Hollister,CA,95024,8316378218,,Hollister,San Benito,,"State Route 156, State Route 25 and Wright Road",95023,,various,156,San Benito River,Hollister Municipal,,,,,,,,,,,,San Benito County Water District ,Yes,2/1/2016,No,Yes,No,,Yes,,No,Yes,"30 Mansfield Rd, Hollister, CA 95024"