SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2007021032,State Water Resources Control Board,,,Well No. 16 Project ,NOE,1/13/2022,1/13/2022,The State Water Resources Control Board (State Water Board) is a Responsible Agency for the Project. The State Water Board’s Drinking Water State Revolving Fund (SRF) Program is financing the Project. The Project includes the design and installation of Well No. 16. The well is to be developed based on a preliminary well design of an 18-inch inside diameter well casing. The depth of the well will be dependent upon test drilling results and be determined during preliminary design. The well would be equipped with a submersible pump for groundwater extraction. Facilities would also include a 320 square-foot pump station house (or steel shade structure) approximately 10 feet in height to be placed near the developed well on a concrete pad. Groundwater produced from the well would be distributed into the City’s existing water system from the pump to a new 16-inch pipeline constructed within the Project Site.,https://ceqanet.opr.ca.gov/2007021032/7,No Name Substation - Firehouse Switchyard 69-kilovolt Transmission Line,Nancy M Ritter,State Water Resources Control Board,Environmental Scientist,nancy.ritter@waterboards.ca.gov,"1001 I Street,",,Sacramento,CA,95814,9164495651,,Needles,San Bernardino,,"3240 Needles Highway, City of Needles, within San Bernardino County",,,,3240 Needles Highway,,,,,,,,,,,Statutory Exemption,"California Code of Regulations, title 14, division 6, chapter 3, article 18, section 15269",The Project has been determined to meet the requirements of the exemption selected above and will not have a significant impact on water quality. The Project involves the installation of a well as an action necessary to prevent or mitigate an emergency.,,,,,,,,,,,,