SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2007018047,Santa Monica Community College District,,,Santa Monica College Stewart Shuttle Parking Lot,NOE,1/8/2007,1/8/2007,"The project involves the College's acquisition, site preparation and continuation of an existing surface parking lot use on an approximately 2.44-acre parcel of land. The existing parking lot will be re-paved and re-striped for up to 270 student parking spaces.",https://ceqanet.opr.ca.gov/2007018047,Santa Monica College Stewart Shuttle Parking Lot,Chui L. Tsang,Santa Monica Community College District,N/A,,1900 W. Pico Boulevard,,Santa Monica,CA,90405,3104344200,,Santa Monica,Los Angeles,,,,,,,,,,,,,,,,,Categorical Exemption,"Section 15301, 04, 11, 30, 32","Class 1(c), (l)(4): The project involves the operation, repair, permitting, and minor alteration of an existing surface parking lot, and related demolition and removal of accessory structures from the lot and similar activities. Class 4(b): The project involves minor alterations to land, including planting new landscaping and building a masonry sound wall around the perimeter of the site. Existing mature trees will be retained on site. Class 11(b): The project involves replacement of an existing surface parking lot with a surface parking lot for existing students of a community college. SMC students that had been parking near the Santa Monica beach at 2600 Barnard Way will instead be directed to park in this lot. Class 30(b)(1), (7): The project will involve the removal of existing natural gas filling stations and appurtenant equipment from the site. The project will also involve the reduction of existing storm water runoff from the site through installation of appropriate on-site detention and percolation systems and implementation of best management practices to remove standard parking lot contaminants from the runoff. Class 32: The project is an infill project involving continuation of an existing surface parking lot in the LMSD Zone. The project consists of less than five acres and is substantially surrounded by urban uses. The project site has no value as habitat for endangered, rare or threatened species.",,,,,,,,,,,,