SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2007012109,"San Francisco, City and County of",City and County of San Francisco,,178 Townsend Project,EIR,12/21/2007,,"The project site at 176 Townsend Street is occupied by the California Electric Light Company Station B building, a contributory building within the South End Historic District. The Project Sponsor proposes to rehabilitate and convert the building from its current use as a valet parking garage to a residential use with up to 85 housing units and accessory off-street parking for the residential uses. The proposed project also includes ground-floor retail uses. The proposed uses would be housed in a five-story building that would be constructed within the footprint of the existing building on the site, totaling approximately 98,900 gross square feet (gsf), with up to 71,500 gsf in residential uses and up to 1,050 gsf in retail uses as well as parking space, open space, common area, and building service space. New construction would include a partially below-grade parking garage, a five-story structure containing the residential and retail components, and street improvements along Clarence Place. The proposed new structure would be contained within the walls of the existing historic structure and would be set back 40 feet from the Townsend Street facade. The new building would rise above the historic structure's existing 23 to 42 foot tall roofline to a maximum height of 50 feet. The ground-floor level would include an enclosed entry courtyard accessible from the Townsend Street entrance, leading to a central hallway connecting to three smaller internal courtyards that would be open to the floors above. Approximately 5,373 gsf of common usable open space would be provided in the entry courtyard and a roof-top deck. Balconies would provide an additional 3,754 gsf of private open space for 38 of up to 85 proposed units. A one-level, 13,200-gsf, partially underground parking garage would include 74 parking spaces for use by the projects residents, with 72 spaces provided by two-car stackers, as well as 33 bicycle parking spaces in stacked lockers. The garage would be accessed through an existing opening in the facade on Clarence Place.",https://ceqanet.opr.ca.gov/2007012109/2,178 Townsend Project,Sarah Jones,City and County of San Francisco Planning Department,N/A,,"1660 Mission Street, Suite 400",,San Francisco,CA,94103,4155759034,,San Francisco,San Francisco,,On the corner of Townsend Street and Clarence Place between 2nd and 3rd Streets,94612,0.5,"Block 3788, Lot 012","80, 280, 101",San Francisco Bay,,Yes,12/21/2007,2/4/2008,"Commercial, Other, Residential",Use Permit,"Cultural Resources, Land Use/Planning, Transportation",,,,,,,,,,,,,,,,,