SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2007011103,"Parks and Recreation, Department of",California Department of Parks and Recreation,,Varner Harbor Dredging Project,NOD,9/10/2007,9/10/2007,"The Department is issuing a Lake and Streambed Alteration Agreement for the project who proposes to remove 7,000 to 8,000 cubic yards of natural deposit material throughout the 450-foot long harbor channel. All dredged materials will be placed on the beach immediately north of the harbor channel. The dredged material will then be spread over a 1.5-2.0 acre area. All dredged material will be placed behind the berm to prevent any surface flow of dredge material or water back into the sea. If needed, straw waddles will also be placed on the upslope side of the berm to aid in this retention. The project proponent also proposes to reconstruct the north jetty of Varner Harbor before the channel is dredged. The reconstructed jetty will provide access for equipment to conduct dredging on the harbor. This structure will be approximately 200 feet long by 12 feet wide by 6 feet high. The jetty will be constructed of approximately 570 cubic yards of exploded angular rip rap, filter fabric, and native soils. The jetty will be built over the footprint of the original north jetty, which is now submerged below the current level of the sea.",https://ceqanet.opr.ca.gov/2007011103/3,Varner Harbor Dredging Project,James Sheridan,California Department of Fish and Game,N/A,,Inlands Deserts Region,"78078 Country Club Drive, Suite 109",Bermuda Dunes,CA,92203,7602009419,,,Riverside,,Highway 111 and State Park Road,92254,,,111,Salton Sea,,,,,,,,,,,,,California Department of Fish and Game ,No,9/10/2007,No,No,Yes,,Yes,,No,Yes,"California Department of Parks and Recreation 200 Palm Canyon Drive Borrego Springs, CA 92004"