SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2006102081,Brooktrails Community Services District,,,Brooktrails Lake Emily Dam,NOD,1/18/2008,1/18/2008,"The purpose of the proposed project is to restore the storage capacity lost (52 acre-feet) due to siltation at Lake Emily. Brooktrails proposed project would replace the existing wooden flashboards by installing inflatable gates, thereby increasing the maximum water level in Lake Emily by three feet. The spillway gate will be 48 feet wide and the structure will include a base slab, 15 foot high concrete cutoff walls, and airbladders to operate the steel gate panels. Installation would be done when the lake water level is eight feet below the spillway. The proposal includes the installation of berm at the dam toe and construction of a small dam control building. The dam would be reinforced at its southwest corner with the addition of an earthen berm to support the foundation and to increase the dam integrity. The berm will have a 225 foot long blanket drain that varies in elevation. Compacted earth and fill material from a borrow area adjacent to the dam will be used in constructing the berm. The earthen berm will fill in 0.04 acre of wetland located at the base of the dam. A 10 foot by 15 foot control building will be constructed near the spillway and may contain an office area.",https://ceqanet.opr.ca.gov/2006102081/3,Brooktrails Rubber Spillway Dam Project,La Tisha Burnaugh,State Water Resources Control Board,N/A,,Division of Water Rights,P.O. Box 2000,Sacramento,CA,95812-2000,9164473479,,Willits,Mendocino,,"Primrose Drive, Blue Jay Lane",95490,19,N/A; LAT/LONG: 39.4467/123.3914,101,"Willits Creek, Dutch Henry Creek, Lake Emily, Lake Ada Rose",Ells Field Airport,,,,,,,,,,,,State Water Resources Control Board ,No,1/16/2008,No,No,Yes,,Yes,,No,,