SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2006101079,"Atwater, City of",City of Atwater,,City of Atwater Wastewater Treatment Plant Improvement Project,EIR,12/27/2007,,"The City of Atwater is proposing the Atwater WastewaterTreatment Plant (WWTP) Project. The project includes decommissioning and demolishing the existing WWTP site on Commerce Avenue, except for the influent pump station; constructing a new WWTP and associated facilities at a new site (Bert Crane Road site) and implementing upgrades to produce disinfected tertiary effluent; installing influent force mains to convey wastewater from the existing influent pump station to the new WWTP, and installing a discharge pipeline from the new WWTP to a new discharge point at the Atwater/Peck Drain, a water of the U.S. The proposed project would include a phased expansion of the capacity of the new WWTP up to 8 million gallons per day, average dry-weather flow to accommodate planned growth within the City and to serve other prospective development surrounding the city.",https://ceqanet.opr.ca.gov/2006101079/3,City of Atwater Wastewater Treatment Plant Improvement Project,David Church,City of Atwater,N/A,,750 Bellevue Road,,Atwater,CA,95301,2093576370,,Atwater,Merced,,"Commerce Avenue and North Applegate Road, Bert Crane Road south of SR 140",95301,~ 100,"056-241-005, 007; 056-200-025, 026",140,"Atwater/Peck Drain, Bear Creek, Black Rascal Creek",,Yes,12/27/2007,2/15/2008,Waste Treatment,,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Noise, Population/Housing, Public Services, Sewer Capacity, Solid Waste, Vegetation, Wetland/Riparian",,,,,,,,,,,,,,,,,