SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2006098227,Mountains Recreation and Conservation Authority,,,Permanent Road Repair/Culvert Replacement along Towsley Creek,NOE,9/25/2006,9/25/2006,"Permanent repair of two existing road crossings at Towsley Creek. Road crossings were damaged in severe storms of 2004-2005. At Site 1, the culverts were clogged and the creek cut a new channel through the road. Emergency repairs consisted of placing culverts in new channel and covering with dirt. Emergency repairs do not meet public access standards. The project involves removing the temporary pipes and backfilling, excavating and placing 3 new metal pipes in the road in line with the flow of the creek, covering with soil and rocks, laying asphalt, and installing rip-rap/concrete. The footprint of the road in the creek will be reduced. During construction, a temporary driveable path will be created with dirt and gravel in a disturbed area to cross the creek and access the lodge. At Site 2, the creek washed out the culverts during the storms and left a wide cut in the creek. Emergency repair consisted of placing small culverts. The project involves removing uncovered temporary culverts and gabions, placing new culvert in the same location, backfilling with dirt from adjacent slope, adding road base, and re-installing rip-rap/concrete.",https://ceqanet.opr.ca.gov/2006098227,Permanent Road Repair/Culvert Replacement along Towsley Creek,Judi Tamasi,Mountains Recreation and Conservation Authority,N/A,,5810 Ramirez Canyon Road,,Malibu,CA,90265,(310) 589-3230 x121,,,Los Angeles,,,,,,,,,,,,,,,,,Categorical Exemption,"Section 15302, 15301, 15304","Replacement or reconstruction of existing structures and facilities in the same site with substantially the same purpose; repair of existing structures, facilities or topographical features, involving negligible or no expansion of use; and minor alterations in the condition of land, water, and/or vegetation are exempt.",,,,,,,,,,,,