SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2006082017,Caltrans 4 (Oakland),"California Department of Transportation, District 4",,I-680/SR 4 Interchange Project - Phase 3 - Walnut Creek Birdge (Streambed Alteration Agreement No. 1600-2017-0558-R3),NOD,6/14/2018,6/14/2018,"CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2017-0558-R3, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Contra Costa Transportation Authority, as represented by Timothy Haile. Project activities authorized through this Agreement are limited to installation of a temporary cofferdam and associated dewatering, widening the two sections of Walnut Creek Bridge approx. 58 feet, and bridge drainage system modification to accommodate the bridge widening. Modification of the existing east-bound southern section of the bridge will occur in the median and will increase the width of the bridge approx. 28.7 feet. Modification of the existing west-bound northern section of the bridge will occur similarly, in the median and with an increase in width of approx. 28.7 feet. The widened structure will consist of two cast-in-place reinforced concrete box girder decks anchored by four abutments, and supported by sixteen concrete piers mounted on a total of 96 piles. ",https://ceqanet.opr.ca.gov/2006082017/8,Interstate 680/State Route 4 Interchange Improvement Project,Jeanette Griffin,CDFW,N/A,,7329 Silverado Trail,,Napa,CA,94559,2092343447,,,Contra Costa,,at I-680/SR-4 interchange,,,,I-680/SR-4,Pacheco Slough and Grayson Creek,Buchanan Field,,,,,,,,,,,,CDFW ,No,6/12/2018,No,No,Yes,,Yes,,No,No,"7329 Silverado Trail, Napa, CA 94559"