SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2006082006,"Gridley, City of",City of Gridley,,Gridley Wastewater Treatment Plant Expansion Project,NEG,8/2/2006,,"The proposed project will address future capacity needs at the existing wastewater treatment plant over the next 20 years. The proposed project will result in an increase in the design capacity from a maximum dry weather flow of 1.05 million gallons per day (mgd) to 1.7 mgd. The increase in primary and secondary treatment capacity will be achieved by significantly increasing aeration in the aeration and polishing ponds (ponds #1 and #2 respectively), improving mixing in the aeration pond and replacing the existing headworks with a new facility. Hydraulic upgrades consisting of yard piping and inlet/outlet modifications will be performed to maintain the required minimum 2 feet of freeboard in all ponds at peak flows. The proposed modifications to the existing aeration systems will increase the wastewater treatment plant capacity and will reduce total suspended solids (TSS) and biochemical oxygen demand (BOD) concentrations in the effluent produced.",https://ceqanet.opr.ca.gov/2006082006,Gridley Wastewater Treatment Plant Expansion Project,Andrea Redamonti,City of Gridley,N/A,,685 Kentucky Street,,Gridley,CA,95948,5308463631,,Gridley,Butte,,E. Gridley Road,,,024-220-023,Hwy. 99,Feather River,,No,8/2/2006,8/31/2006,Other,,"Air Quality, Cultural Resources, Vegetation, Wildlife",,,,,,,,,,,,,,,,,