SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2006072018,Soquel Creek Water District,,,Soquel Creek Water District Well Master Plan,NOP,7/7/2006,,"The Soquel Creek Water District (SqCWD) is pursuing a Well Master Plan (WMP) project to improve redundancy and flexibility in the SqCWD's water system while redistributing pumping away from coastal areas and thus, reduce the potential for saltwater intrusion. The WMP calls for the installation of three new groundwater production wells (O'Neill Ranch, Cunnison Lane or Austrian Way, and Granite Way-Aptos Village), the Cunnison Lane and Austrian Way site are alternate sites and thus, only one of these sites will be chosen for well construction and development. With the exception of the Granite Way-Aptos Village site which would connevy to an existing treatment plant, iron and manganese removal treatment plants would be constructed at all proposed well sites. Additional infrastructure improvements would include pipeline installation to connect to existing water supply mains, drainage infrastructure, and sanitary sewer mains in the vicinity of the well sites.",https://ceqanet.opr.ca.gov/2006072018,Soquel Creek Water District Well Master Plan,Jeff Gailey,Soquel Creek Water District,N/A,,5180 Soquel Drive,,Soquel,CA,95073,8314758500,,,Santa Cruz,,41st Ave/Soquel Dr; Cunnison Ln/Soquel Dr; Granite Wy/Cathedral Dr; Polo Grounds Reg Park,,5 acres,"030-341-10, 037-101-48, 040-461-06, 041-201-04, 041-011-20","1, 17","Soquel Creek, Aptos Creek, Trout Gulch, Unnamed tributaries to Soquel Creek",,No,7/7/2006,8/7/2006,Water Facilities,,"Aesthetics, Air Quality, Coastal Zone, Cultural Resources, Cumulative Effects, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Noise, Public Services, Septic System, Sewer Capacity, Transportation, Vegetation, Wetland/Riparian, Wildlife",,,,,,,,,,,,,,,,,