SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2006062147,Butte County,,,Table Mountain Quarry Expansion,NOD,1/29/2007,1/29/2007,"1. Expansion of the permitted mining area to include approximately 44 +/- additional acres of olivine basalt on the top of North Table Mountain, and the extraction of such material to a depth of approximately 150 feet below existing grade. 2. Approximately 2,800 feet of road reconstruction along the existing road grade from the plant site easterly into Coal Canyon, and approximately 1,500 feet of new road construction, with switchbacks, to the top of North Table Mountain. 3. Installation of an elevated conveyor system to transport rock from the quarry to the processing facility (a distance of approximately 1,500 feet). 4. Relocation of the processing facility approximately 700 feet to the northeast. 5. Time extension of UP 96-02, which is set to expire December 31, 2009 to the year 2029. 6. Construction of a 4,000 square foot shop building. 7. Construction of a new rail spur, involving the laying of 2,010 linear feet of track adjacent and parallel to the existing rail spur. 8. Reclamation Plan pursuant to the Surface Mining and Reclamation Act.",https://ceqanet.opr.ca.gov/2006062147/2,Amendment to Table Mountain Quarry Min 04-01 Condition7/UP 96-02 Condition 11,Dan Breedon,Butte County,N/A,,7 County Center Drive,,Oroville,CA,95965,5305387629,,Oroville,Butte,,Table Mountain Blvd and SR-70,95965,,041-140-014,"SR-70, SR-149, SR-191",Local Creeks,,,,,,,,,,,,,Butte County Board of Supervisors ,Yes,1/23/2007,No,No,Yes,,Yes,,No,,Butte County