SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2006042089,"South Lake Tahoe, City of",City of South Lake Tahoe,,"Rocky Point Erosion Control Project, Phases 3 & 4",NEG,4/14/2006,,"Construct erosion control improvements within a 78-acre area bordered on the west by Aspenwalk Road, on the north by Primrose Road and Midway Avenue, on the east by Rocky Point Road, and on the south by Keller Road. Erosion control improvements include soil and vegetation restoration, stormwater treatment basins, infiltration chambers, boulder parking barriers, rolled curb and gutter, stormdrain pipe, drop inlets, manholes, sediment traps, AC swales, AC berms, and cobble swales. The planned improvements will be constructed in the City right of way, on public land, and privately owned parcels that will be acquired by the City or where easements will be purchased. Approximately 132 trees (60 smaller than 10 inches diameter at breast height (dbh) and 72 trees 10 inches dbh or greater) will be removed. No trees larger than 24 inches dbh will be removed.",https://ceqanet.opr.ca.gov/2006042089,"Rocky Point Erosion Control Project, Phases 3 & 4",Stan Hill,City of South Lake Tahoe,N/A,,1900 Lake Tahoe Boulevard,,South Lake Tahoe,CA,96150,5305426039,,South Lake Tahoe,El Dorado,,Pioneer Trail and Sheperds Road,96150,,many,Hwy. 50 & 89,Lake Tahoe,,No,4/14/2006,5/15/2006,Other,Site Plan,"Aesthetics, Air Quality, Biological Resources, Cultural Resources, Drainage/Absorption, Geology/Soils, Hydrology/Water Quality, Land Use/Planning, Public Services, Transportation, Vegetation",,,,,,,,,,,,,,,,,