SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2006042082,Contra Costa Water District,,,Contra Costa Canal Encasement Project,MND,4/14/2006,,"The Contra Costa Water District (CCWD) is proposing construction of the Contra Costa Canal Encasement Project, which involves installing up to 3.97 miles of buried pipeline in place of the existing unlined portion of the Contra Costa Canal. The pipeline installation would occur between the trash rack near Rock Slough and Pumping Plant No. 1. Using preliminary engineering design analyses, CCWD recommends that the new pipeline be installed in the U.S. Bureau of Reclamation's 300-foot canal right-of-way (ROW). CCWD would consider constructing portions of the pipeline outside of the open waters of the canal but within the ROW, as well as adjacent to the canal ROW, if use of portions of adjacent property where CCWD would hold construction easements would improve constructability without incurring significant environmental impacts. The final pipeline alignment would be determined during the final design process.",https://ceqanet.opr.ca.gov/2006042082,CEQA Addendum No. 7 Segment 5B Diesel Generator & Pump Use,Mark Seedall,Contra Costa Water District,N/A,,2411 Bisso Lane,,Concord,CA,94524,9256888119,,Oakley,Contra Costa,,Jersey Island Road and Cypress Road,94561,,,SR 4,"Marsh Creek, Emerson Slough, Dutch Slough",,Yes,4/14/2006,5/15/2006,Water Facilities,,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildlife",,,,,,,,,,,,,,,,,