SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2005118389,Caltrans 3 (Marysville),"California Department of Transportation, District 3",,Lake 29 Channelization Project,NOE,11/28/2005,11/28/2005,"This project proposes to widen the roadway to add left-turn lanes in both directions and a right-turn pocket for southbound movement from State Route to Rancheria Road. Road widening will take place along both sides of the highway. The paved shoulders will be widened. Asphalt-concrete (AC) leveling, open-grade asphalt overlay, and drainage improvements will also be included in the project.",https://ceqanet.opr.ca.gov/2005118389,Lake 29 Channelization Project,Jennifer Heichel,"Department of Transportation, District 3",N/A,,2389 Gateway Oaks Drive,,Sacramento,CA,95833,9162740625,,,Lake,,,,,,,,,,,,,,,,,Categorical Exemption,Section 15301,This project is exempt as it has been determined that no significant environmental impacts or effects will occur as a result of this project.,,,,,,,,,,,,