SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2005112126,"San Jose, City of",City of San Jose,,Ballpark Study in the Diridon Arena Area,EIR,8/30/2006,,"The proposed project consists of the development of an approximately 1.5 million square foot major league baseball stadium, a parking structure, and a future commercial development site on approximately 23.1 acres. Maximum capacity of the stadium would be 45,000 patrons. The facility would also contain a combination of retail and restaurant uses either associated directly with the stadium or facilities located on the exterior of the building that provide general or retail or food services. As part of the proposed project, an approximately 420,000 square foot, five-story, 1,200-space parking structure is proposed south of the stadium, south of Park Avenue. A pedestrian bridge crossing Park Avenue would connect the stadium and parking structure. Access to the parking structure would be provided from Park Avenue and South Autumn Street. Montgomery Street between W. San Fernando and Park Avenue would be abandoned, and S. Autumn Street would be realigned to the east to accommodate the proposed project.",https://ceqanet.opr.ca.gov/2005112126/3,Ballpark Study in the Diridon/Arena Area,Michael Rhoades,City of San Jose,N/A,,200 East Santa Clara Street,,San Jose,CA,95113-1905,4085357800,,San Jose,Santa Clara,,"Santa Clara Street, Park Avenue, S. Autumn Street",95113,23,Multiple,"82, 87, 280, 880","Los Gatos Creek, Guadalupe River",Mineta SJ International,No,8/30/2006,10/16/2006,Other,Site Plan,"Air Quality, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Noise, Public Services, Recreation, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildlife",,,,,,,,,,,,,,,,,