SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2005112126,"San Jose, City of",City of San Jose,,Ballpark Study in the Diridon/Arena Area,NOP,11/29/2005,,"The City of San Jose Redevelopment Agency is considering the development of a major league baseball stadium, a parking structure and a future commercial development site. The project would reconfigure the 17 existing parcels in order to develop an approximately 706,800 square foot major league baseball stadium. Maximum capacity of the stadium would be 45,000 patrons. The baseball stadium, including all scoreboards, would have a maximum height of 200 feet. The lighting structures could exceed 200 feet in height. As part of the proposed project, an approximately five-story, 1,200-space parking structure is proposed south of the stadium, south of Park Avenue. A pedestrian bridge crossing Park Avenue would connect the stadium and parking structure. Access to the parking structure would be provided from Park Avenue and South Autumn Street. The project may also include the relocation of a PG&E substation currently located on the stadium site to a different location on the stadium site or to a location near or adjacent to the proposed parking facility on the south side of Park Avenue. ",https://ceqanet.opr.ca.gov/2005112126,Ballpark Study in the Diridon/Arena Area,M. Rhoades,City of San Jose,N/A,,200 East Santa Clara Street,,San Jose,CA,95113-1905,4085357800,,San Jose,Santa Clara,,"W. San Fernando, Park Avenue, Autumn Street",95113,17,Multiple,"82,87,280,880","Los Gatos Creek, Guadalupe River",NYM-SJ Int'l,Yes,11/29/2005,12/28/2005,Recreational,Master Plan,"Aesthetics, Air Quality, Cultural Resources, Cumulative Effects, Drainage/Absorption, Economics/Jobs, Flood Plain/Flooding, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Noise, Public Services, Recreation, Sewer Capacity, Solid Waste, Transportation, Wetland/Riparian",,,,,,,,,,,,,,,,,