SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2005102056,"Elk Grove, City of",City of Elk Grove,,Grant Line Road Widening Including Grade Separation from East Stockton Bouldvard to New Waterman Road,NOD,12/10/2012,12/10/2012,"Widen Grant Line Road between Survey Road and Bradshaw Road; realign the Grant Line Road/Waterman Road and Grant Line Road/Bradshaw Road intersections; install traffic signals; realign portions of Waterman Road; provide new access points, construct a frontage road and secondary access route south of Grant Line Road, install bike lanes, crosswalks and pedestrian sidewalks, replace the existing at-grade UPRR crossing with a grade-separated overhead railroad crossing; cul-de-sac the existing Waterman Road; provide paved access to parcels adjacent to the UPRR tracks; relocate various utilities and install drainage modifications. The 22.2-acre Grant Line Road Widening Project - Phase l consists of widening Grant Line Road from Survey Road to Mosher Road, to improve the flow of traffic to and from State Route 9, alleviating existing and anticipated future traffic operational deficiencies, and increasing safety along that portion of Grant Line Road. The project includes widening, realignment and modification of roadways, constructing a sidewalk/bike lane, installing new or extending existing culverts, and replacing an existing railroad crossing. ",https://ceqanet.opr.ca.gov/2005102056/7,Grant Line Road Widening Project,Gary Grunwald,California Transportation Commission,N/A,,1120 N Street,,Sacramento,CA,95814,9164782236,,Elk Grove,Sacramento,,~ from intersection of Grant Line Rd/Survey Rd to the intersection of Grant Line Rd/Bradshaw Rd,,65,,SR 99,"Cosumnes River, Elk Grove Creek, Deer Creek, Laguna Creek",Sunset Skyranch,,,,,,,,,,,,California Transportation Commission ,No,12/6/2012,No,No,Yes,,Yes,,No,No,"City of Elk Grove 8401 Laguna Palms Way Elk Grove, CA 95758"