SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2005098164,Sacramento County,,,Zone 40 Groundwater Wells Downhole Construction: Gilliam Meadows 2,NOE,9/12/2005,9/12/2005,"The proposed well will supply water to the proposed Franklin Boulevard water treatment facility for treatment, storage, and delivery to the Zone 40 water system for the Gilliam Meadows 2 development. The well will be equipped with a pump, motor, piping, instrumentation and electrical controls. Other site improvements will include paving, perimeter fencing or walls, site drainage, and lighting. There will be no chemicals or hazardous materials stored on site.",https://ceqanet.opr.ca.gov/2005098164,Zone 40 Groundwater Wells Downhole Construction: Gilliam Meadows 2,Joyce Horizumi,Sacramento County Dept. of Environmental Review,N/A,,"827 7th Street, Room 220",,Sacramento,CA,95814,9168747914,,Elk Grove,Sacramento,,,,,,,,,,,,,,,,,Categorical Exemption,Section 15303(d),The proposed project consists of the construction and installation of facilities related to water supply associated with approved development without resulting in additional environmental impacts and is therefore exempt from the provisions of CEQA.,,,,,,,,,,,,