SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2005098163,Sacramento County,,,Maritime Well Site,NOE,9/12/2005,9/12/2005,"The proposed project will construct a water supply well to replace the Elk Grove Blvd. well that was deemed unsuitable for use as a municipal well in July 2001. The well will be approximately 300 feet in depth and will be equipped with a pump and 125 horsepower electric motor capable of pumping water from the well at a rate of 1,500 gallons per minute (gpm). A vertical line shaft pump and motor assembly is proposed at this site.",https://ceqanet.opr.ca.gov/2005098163,Maritime Well Site,Joyce Horizumi,Sacramento County Dept. of Environmental Review,N/A,,"827 7th Street, Room 220",,Sacramento,CA,95814,9168747914,,Elk Grove,Sacramento,,,,,,,,,,,,,,,,,Categorical Exemption,Section 15303(d),"The proposed project consists of the construction of a new small facility (well site). No impacts are associated with this project. Therefore, the project is exempt from the provisions of CEQA.",,,,,,,,,,,,