SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2005081166,Santa Barbara County,,,Alcatraz Creek Erosion Control Project,NOD,11/1/2005,11/1/2005,"The Operator proposes to alter the streambed to repair erosion damage to the mouth of Alcatraz Creek to protect the Gaviota Terminal, an Arguello petroleum facility. The forebay facility, which includes electrical equipment, piping and pumps for salt water intake to the desalination plant, is in danger of being undermined and sea water may enter the underground storage area. The area is also an archaeological site. Rock rip-rap will be placed along the banks with large rock at the toe of the bank. The eroded areas of the creek will be filled with soil compacted to 90% under the rock rip-rap. Cultural deposits will be covered with a geo-fabric prior to the fill. A temporary concrete apron will be poured between the rock rip-rap and the culvert road crossing. The crossing will be replaced with the addition of a metal culvert, replacing an old brick culvert. The portion of intact brick culvert will be sealed with concrete, and the broken pieces shall be removed. Rock which was used for a temporary repair will be collected and used to protect the area which is in the surf/tide line.",https://ceqanet.opr.ca.gov/2005081166/3,Alcatraz Creek Erosion Control Project,Natasha Lohmus,California Department of Fish and Game,N/A,,4949 Viewridge Avenue,,San Diego,CA,92123,8056846281,,Goleta,Santa Barbara,,Hwy. 101 and Calle Mariposa Reina,,42.44,081-130-019 and 081-130-060,US 101,Pacific Ocean,,,,,,,,,,,,,California Department of Fish and Game ,No,10/28/2005,No,No,Yes,,Yes,,No,Yes,"Santa Barbara County Planning 123 E. Anapamu Street Santa Barbara, CA 93101"