SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2005072154,Eureka Unified School District,,,Eureka High School and Eureka High School Annex Proposed Modernization Project,NOD,9/2/2005,9/2/2005,"Eureka City Schools has proposed a modernization project at the Eureka High School and adjacent Eureka High School Annex. The multiple benefits of the proposed improved project include: 1. Improve accessibility to facilities through addition of ADA ramps, elevators, and changes to walkways and parking. 2. Improve site safety with seismic retrofits and fire alarm system upgrades. 3. Enhance efficiency and function of existing structures. 4. Provide aesthetic appeal with interior and exterior renovations. 5. Modernize utilities. 6. Improve site drainage. 7. Stabilize hillside. The project will involve the following Eureka High School (EHS) buildings: Main Classroom, Auto Shop, Science, Industrial Arts, District Information Technology, Music, Wood Shop, Albee Stadium facilities, and the EHS Annex building. Changes to the site will include structural renovations, reconfiguration of classrooms and facilities, the demolition of the District Information Technology Building in favor of an outdoor central campus quad, additions and repairs to existing buildings, and fire alarm, seismic, and ADA upgrades. The project will include the installation and/or modification of underground utilities throughout the project site, as needed. To contend with possible slope failure east of the Industrial Arts Building, the construction of a retaining wall is proposed. The Eureka High School Annex will receive an ADA accessibility addition on the exterior of the building at the main entrance.",https://ceqanet.opr.ca.gov/2005072154/2,Eureka High School and Eureka High School Annex Proposed Modernization Project,Jerry Johnson,Eureka Union School District,N/A,,3200 Walford Avenue,,Eureka,CA,95503,7074412412,,Eureka,Humboldt,,"Del Norte St. to the north, Huntoon St. to the south, N St. to the east, and J St. to the west",95501,25,"011-121-01, 131-05, 014-01, 005, 132-08, 246-07",101,Humboldt Bay,,,,,,,,,,,,,Eureka Unified School District ,Yes,9/2/2005,No,No,Yes,,Yes,,No,Yes,Eureka Unified School District