SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2005072139,Sacramento Municipal Utility District,,,Metro Air Park Neighborhood Electric Distribution Project,MND,7/22/2005,,"Construct and operate two 69-kV neighborhood substations that would step down 69kV voltage to 12kV, consisting of (1) the proposed Lot 6 substation on the east side of Power Line Road just south of the existing Central Main Canal approximately 1,200 feet south of Elverta Road. The proposed Lot 44 substation would be located on the west side of the planned Lone Tree Road just south of the Central Main Canal, approximately 4,300 feet south of Elverta Road. The project also includes the following subtransmission line components: (1) Segment 1: a single circuit 69 kV overhead subtransmission line located on the south side of Elverta Road between Power Line Road and the planned Lone Tree Road is proposed to be upgraded to a double circuit 69 kV overhead line; (2) Segment 2: a single circuit 69 kV overhead subtransmission line located on the east side of Power Line Road between Elverta Road and Elkhorn Boulevard is proposed to be upgraded to a double circuit 69 kV overhead line; and (3) Segment 3, Option Elverta Road and Elkhorn Boulevard, or Segment 3 Option 2: woudl be installed along parcel boundaries ranging from 600 to 900 feet west of the planned Lone Tree Road between Elverta Road and Elkhorn Boulevard.",https://ceqanet.opr.ca.gov/2005072139,Metro Air Park Neighborhood Electric Distribution Project,Ron Scott,Sacramento Municipal Utility District,N/A,,P.O. Box 15830 MS B203,,Sacramento,CA,95852-1830,9167325114,,Sacramento,Sacramento,,"Elverta Road, Power Line Road, and Elkhorn Boulevard",,0.9,"201-1020-006 (Lot 6 substation), 201-1020-044 (Lot 44 substation)","SR 70/99, I-5","Central Marin Canal, Natomas Cross Canal",Sacramento International Airport,No,7/22/2005,8/22/2005,Power,,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Public Services, Recreation, Schools/Universities, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildlife",,,,,,,,,,,,,,,,,