SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2005058398,"Regional Water Quality Control Board, Region 1 (North Coast), Santa Rosa",,,United States Forest Service - Fairview Boat Ramp Upgrade and Bank Protection,NOE,5/31/2005,5/31/2005,"The project is to update and improve an existing boat ramp facility and install additional shoreline erosion protection. The existing boat ramp will be overlayed with concrete. The boat ramp will be widening at the top by adding 1,580 sf of concrete. Approximately 750 cy (6,140 sf) of riprap will be added to the shoreline adjacent to the boat ramp to prevent erosion.",https://ceqanet.opr.ca.gov/2005058398,United States Forest Service - Fairview Boat Ramp Upgrade and Bank Protection,Dean Prat,"Regional Water Quality Control Board, Region 1 (North Coast)",N/A,,"5550 Skylane Boulevard, Suite A",,Santa Rosa,CA,95403,7075762801,,,Trinity,,,,,,,,,,,,,,,,,Categorical Exemption,Section 15301,"The project consists of repair, maintenance, and minor alteration of an existing facility involving negligible expansion of use beyond that existing at the time of the lead agency's determination.",,,,,,,,,,,,