SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2005058136,Metropolitan Water District of Southern California,,,Relocation and Repair of Fencing at the Garvey Reservoir,NOE,5/13/2005,5/13/2005,"The Metropolitan proposes to relocate and repair fencing at the Garvey Reservoir. Metropolitan proposes to relocate fencing around a catch basin located on the southwestern edge of Metropolitan's property near Fulton Avenue. The relocation of the fencing is being performed to reflect the correct property boundary and enclose the catch basin within Metropolitan's property line. Metropolitan also proposes repair fencing throughout the Garvey Reservoir property, as necessary.",https://ceqanet.opr.ca.gov/2005058136,Relocation and Repair of Fencing at the Garvey Reservoir,William Fong,Metropolitan Water District of Southern California,N/A,,P.O. Box 54153,,Los Angeles,CA,90054,2132176899,,Monterey Park,Los Angeles,,,,,,,,,,,,,,,,,Categorical Exemption,"Section 15301, 02, 03","The project consists of the operation, repair, maintenance, or minor alteration of existing public structures, facilities, mechanical equipment, or topographical features, involving negligible expansion of use beyond that existing at the time of the lead agency's determination. The project also consists of the replacement or reconstruction of existing structures and facilities where the new structure will be located on the same site as the structure replaced and will have substantially the same purpose and capacity as the structures replaced. The project also consists of the construction and location of limited numbers of new, small facilities or structures.",,,,,,,,,,,,